PROJECT OVERVIEW
Mitsubishi City-Multi System
Everett , WA
Commercial, 7000ft2
Objective
The objective of this project was to replace the aging boiler system at St Mary Magdalen School with an efficient Mitsubishi City Multi heat pump system. The aim was to achieve substantial energy savings, enhance overall comfort within the school facilities, and support a more sustainable energy future.

Challenges
- Compatibility Issues: The existing infrastructure was tailored for a boiler system, necessitating extensive modifications to accommodate the new heat pump technology.
- Limited Downtime: With regular school activities, there was a critical need to manage the installation process without causing significant disruptions.
- Upfront Costs: There was initial concern over investment costs, particularly regarding how the new system would compare financially with the existing boiler.
Solutions
- Detailed Assessment and Planning: Conducted a comprehensive analysis of the school’s heating and cooling needs, allowing for a tailored installation plan that addressed potential compatibility issues.
- Staged Installation Approach: Developed a phased installation plan that allowed for the continued operation of school activities, minimizing disruptions while the new system was put into place.
- Cost Analysis and Education: Provided the school leadership with detailed financial projections and benefits analysis, showcasing the long-term savings and operational efficiencies of the Mitsubishi system over the previous boiler setup.
Results
- Significant Energy Savings: In the first month after installation, St Mary Magdalen School reported a remarkable reduction of $2000 in their energy bills.
- Enhanced Comfort Levels: Feedback from school indicated improved comfort throughout the facilities, with more consistent heating and cooling performance.
- Sustainable Energy Use: The heat pump system greatly enhanced energy efficiency, positioning the school as a proactive contributor to environmental sustainability while also ensuring reduced operational costs going forward.
Get Started
Request Service
Request Service
What is Evergreen State Heat & AC’s 100%, 30-Day Money Back Guarantee?
This is one of the biggest investments you’ll make as a homeowner, and for many, one of the most stressful. Our goal is to remove the risk and concern of both the investment and the installation experience.
Read More Duvall PSE Heat Pump Rebate Up to 8000 Dollars
Homeowners in Duvall Washington may qualify for up to $8,000 in rebates from Puget Sound Energy by switching from a natural gas heating system to an electric heat pump. Evergreen State Heat and AC is ready to help you determine eligibility ...
Read More Learning from Our Mistakes: A Look at Evergreen’s Lowest Reviews
Every company has moments where things don’t go as planned. At Evergreen, we believe the measure of a business isn’t whether it makes mistakes, it’s whether it learns from them and becomes better.
Read More Beware of the High Pressure Same-Day Discounts
Have you ever been cornered in your home into a 2+ hour sales presentation and know in 10 minutes that this company and salesman is not for you? Unfortunately, this happens a lot in the residential HVAC industry ...
Read More Tale of a Leaky Heat Pump System
A client recently reached out to us after experiencing issues with a newly installed HVAC system. They had initially hired a low-bid contractor—essentially just two guys operating out of a truck...
Read More Should I Finance or Pay Cash for my HVAC System in Seattle?
You’re a Seattle-area homeowner shopping for a new HVAC system, you’re not alone in asking this. Should I finance my HVAC system or pay in cash? We’ll break down the pros and cons.
Read More So you decided to put the new deck there?
The railings blocked access to an electrical disconnect. The deck installation contractor never noticed this, nor evidently did the permit inspector. Thankfully, the homeowner did notice that this would be a problem and called us out for a relocation
Read More Too Good to be True?
A homeowner with a larger home with two gas furnace – heat pump HVAC systems called us in for a proposal to replace their first system. While they liked our company our price was in the $16,000 range. Another company bid $11,000 for the ‘same’ system. While the units were similar, the caliber of workmanship…
Read More Commercial Fluorescent Lighting 2028 Phase Out
On March 28, 2024, Washington legislators successfully passed their Clean Lighting Bill (HB 1185), which bans and begins their elimination of commercial and other fluorescent lighting technology.
Read More